Il presente lavoro descrive nel dettaglio i contenuti dell’indagine svolta, i metodi di studio adottati ed i risultati conseguiti. Lo studio è stato condotto sull’intera superficie del territorio interessato dall’intervento in oggetto mediante rilievi, raccolta di dati, misurazioni e verifiche tecniche specifiche, ed ha affrontato le tematiche territoriali attinenti l’assetto geologico, geomorfologico, idrogeologico ed idrografico.
STATO ATTUALE PLACES OF
The study area, the subject of action is located in the south-east of the boundary wall of the access road to the cemetery, the area has several points of the sliding surfaces, where the soil coinciding of intense rainfall undergoes movement to the valley, especially in areas where the landfill has the greatest thickness.
in the contact zone soil retaining wall of the valley, occurs at several points accumulation and stagnation of water. Then the lack of an adequate system of removal and disposal of stormwater causes geomorphological instability of the area.
The land subject to this problem are di natura sedimentaria limoso-sabbioso, (vedi relazioni geologiche allegate al progetto del 08/04/2004 e del 11/05/2006) che non hanno ancora avuto il tempo di stabilizzarsi dopo che essi hanno subito un certo grado di rimaneggiamento. Inoltre in diversi punti si osservano delle zone di contropendenza, dovuta ad una errata sistemazione del materiale rimosso.
L’intervento di messa in sicurezza dell’area, era stata già discussa e valutata verbalmente dal sottoscritto in diversi incontri avuti con le parti interessate, e si precisava di organizzare le diverse fase di lavoro per la sistemazione dell’area nella stagione di secca.
Nella stagione di secca questi tipi di materiali si presentano con il minimo grado di saturazione, di Consequently, the leveling and compaction of the material was easy to perform, making the operations of accommodation in the most efficient in the result.
hydrologic-hydraulic study of the design and implementation
In this section we expose the calculations for the dimensioning of a system for removal of rainwater to be carried out in Altomonte (CS), in a portion of land downstream of the cemetery.
The removal of stormwater in question consists essentially of:
a trench (trench guard) to achieve near and parallel to the foot of the retaining wall in c.a. di recente costruzione. Tale trincea ha lo scopo di raccogliere le acque meteoriche provenienti dal bacino idrografico di progetto e di convogliarle alle altre due trincee laterali di seguito descritte;
due trincee (trincee laterali) da realizzare in modo tale da recepire le acque captate dal “fosso di guardia” canalizzandole a valle dall’area oggetto di intervento.
Il dimensionamento delle trincee in oggetto è stato condotto seguendo la procedura qui sotto riportata:
definizione delle caratteristiche del bacino idrografico di progetto;
individuazione della stazione pluviometrica di riferimento, adottando un criterio di similitudine climatica tra la zona oggetto di intervento e il sito di installazione the rain gauge reference
data retrieval rainfall (maximum height of precipitation per hour) required for the sizing and location for a sufficiently long period (even years to No. 31);
calculation of the curve design rainfall at an appropriate time return (T = 20 years);
calculation of the maximum flow (Qmax);
type section of the trenches and building characteristics.
1. Characteristics of the river basin project
The catchment area subtended by the removal of stormwater system to be implemented has the following geometrical characteristics:
- area (A): 18.000 m2 circa;
- lunghezza dell’asta principale (L): 170m circa;
- quota della “sezione di chiusura” (H0, cioè della zona di valle del bacino, ove dovrà essere realizzato il fosso di guardia): circa 480 m.s.m.;
- quota della parte più alta del bacino (H): circa 550 m.s.m.);
- quota media del bacino (Hm): circa 515 m.s.m.;
- coefficiente di deflusso (c) assunto pari a 0,6. Tale parametro, che è ≤1, è fondamentale al fine di calcolare la portata di deflusso e dipende sia dalla natura del terreno che caratterizza il bacino che dalla presenza di superfici più o meno impermeabili (es. strade, tetti, parcheggi, ecc.).................................................
From the results it follows that the maximum capacity of the project travels inside the pipe D = 45 cm in uniform motion with a speed of between 4.58 and 5.35 m / s and this result can be considered acceptable.
The trenches will be made based on the typical section shown in Figure 3 indicates that the points of attachment between the moat and trenches and guard in the trench work of waste water must be made of the wells.
STATO ATTUALE PLACES OF
The study area, the subject of action is located in the south-east of the boundary wall of the access road to the cemetery, the area has several points of the sliding surfaces, where the soil coinciding of intense rainfall undergoes movement to the valley, especially in areas where the landfill has the greatest thickness.
in the contact zone soil retaining wall of the valley, occurs at several points accumulation and stagnation of water. Then the lack of an adequate system of removal and disposal of stormwater causes geomorphological instability of the area.
The land subject to this problem are di natura sedimentaria limoso-sabbioso, (vedi relazioni geologiche allegate al progetto del 08/04/2004 e del 11/05/2006) che non hanno ancora avuto il tempo di stabilizzarsi dopo che essi hanno subito un certo grado di rimaneggiamento. Inoltre in diversi punti si osservano delle zone di contropendenza, dovuta ad una errata sistemazione del materiale rimosso.
L’intervento di messa in sicurezza dell’area, era stata già discussa e valutata verbalmente dal sottoscritto in diversi incontri avuti con le parti interessate, e si precisava di organizzare le diverse fase di lavoro per la sistemazione dell’area nella stagione di secca.
Nella stagione di secca questi tipi di materiali si presentano con il minimo grado di saturazione, di Consequently, the leveling and compaction of the material was easy to perform, making the operations of accommodation in the most efficient in the result.
hydrologic-hydraulic study of the design and implementation
In this section we expose the calculations for the dimensioning of a system for removal of rainwater to be carried out in Altomonte (CS), in a portion of land downstream of the cemetery.
The removal of stormwater in question consists essentially of:
a trench (trench guard) to achieve near and parallel to the foot of the retaining wall in c.a. di recente costruzione. Tale trincea ha lo scopo di raccogliere le acque meteoriche provenienti dal bacino idrografico di progetto e di convogliarle alle altre due trincee laterali di seguito descritte;
due trincee (trincee laterali) da realizzare in modo tale da recepire le acque captate dal “fosso di guardia” canalizzandole a valle dall’area oggetto di intervento.
Il dimensionamento delle trincee in oggetto è stato condotto seguendo la procedura qui sotto riportata:
definizione delle caratteristiche del bacino idrografico di progetto;
individuazione della stazione pluviometrica di riferimento, adottando un criterio di similitudine climatica tra la zona oggetto di intervento e il sito di installazione the rain gauge reference
data retrieval rainfall (maximum height of precipitation per hour) required for the sizing and location for a sufficiently long period (even years to No. 31);
calculation of the curve design rainfall at an appropriate time return (T = 20 years);
calculation of the maximum flow (Qmax);
type section of the trenches and building characteristics.
1. Characteristics of the river basin project
The catchment area subtended by the removal of stormwater system to be implemented has the following geometrical characteristics:
- area (A): 18.000 m2 circa;
- lunghezza dell’asta principale (L): 170m circa;
- quota della “sezione di chiusura” (H0, cioè della zona di valle del bacino, ove dovrà essere realizzato il fosso di guardia): circa 480 m.s.m.;
- quota della parte più alta del bacino (H): circa 550 m.s.m.);
- quota media del bacino (Hm): circa 515 m.s.m.;
- coefficiente di deflusso (c) assunto pari a 0,6. Tale parametro, che è ≤1, è fondamentale al fine di calcolare la portata di deflusso e dipende sia dalla natura del terreno che caratterizza il bacino che dalla presenza di superfici più o meno impermeabili (es. strade, tetti, parcheggi, ecc.).................................................
From the results it follows that the maximum capacity of the project travels inside the pipe D = 45 cm in uniform motion with a speed of between 4.58 and 5.35 m / s and this result can be considered acceptable.
The trenches will be made based on the typical section shown in Figure 3 indicates that the points of attachment between the moat and trenches and guard in the trench work of waste water must be made of the wells.